Mustang
Thursday, October 21, 2010
Off to the body shop
We said good bye to the stang today. It was flat bedded to our friend Don's body shop in Westport, MA. We finished as much as we could and now it was time for the pros to finish the final body work and paint. It will be painted black with gold gt stripes. The guys at the shop will be removing the engine and the 6cyl will be replaced with a 289 V8 engine and C4 tranny, with an 8inch rear end. We will keep the progress posted as we go along.
Sunday, October 17, 2010
Rear door window refurbishing
We decided to refurbished the rear windows. The replacement parts were very inexpensive and it appeared to be an easy job. Thank god Gramp was around that week as we were not having much luck getting the windows out. Once Gramp figured it out it went pretty quickly. We POR 15 as much as we could and put the new rollers on the tracks and it now works as good as new. Thanks Gramp we really appreciated the help.
Quater Panel replacement
Cowl repair is complete
It was a long hard road to repair the cowl, yet it is done. The cowl is the mustang's biggest problem and the first repair that needs to be done. We started the repair then were sidetracked by the floors. We had to wait for a heater box to come in from the parts supplier. We needed the box to line up the induction hole. The cowl was POR 15 and then sprayed black before the top piece was welded in place. There was lots of patches and grinding but we saved 400 on parts by restoring what we could.
Subscribe to:
Posts (Atom)